Leningrad region.
The work in this house was carried out between September and November 2024.
Rough and final electrical installation has been carried out in this house. An electrical panel for 18 modules is installed inside the house. 39 electric current sources are connected.
Leningrad region.
The work in this house was carried out between February and April 2025.
Rough and final electrical installation has been carried out in this house. An electrical panel for 54 modules is installed inside the house. 45 electric current sources are connected.
Leningrad region.
The work in this house was carried out between December 2024 and February 2025.
Rough and final electrical installation has been carried out in this house. An electrical panel for 27 modules is installed inside the house. 76 electric current sources are connected.
Saint-Petersburg.
The work in this apartment was carried out between June and December 2024.
This apartment has been renovated on a turnkey basis: complete dismantling, replacement of all plumbing and electrics, alignment of walls and ceilings, finishing according to an individual design project.
Unique author's design, environmentally friendly materials, manual assembly.
Unique author's design, environmentally friendly materials, manual assembly.
Unique author's design, environmentally friendly materials, manual assembly.
Unique author's design, environmentally friendly materials, manual assembly.
We are located in the city of Saint Petersburg (Russia) and operate within the city of Saint Petersburg and the Leningrad region. If you are from another region, we will not be able to provide you with every service.
Our office does not have a regular work schedule, as we often visit the facilities, so if you want to come to our office, we need to arrange a date and time.
It's better for you to write us a message than to try to call us by phone. Recently, calls from scammers have become more frequent, so we may not answer your call.